Skip to main content

Services

SMT / DIP / TEST / ASSY: electronics manufacturing

A board needs placement, insertion, testing, assembly and packing; you do not have to split them across suppliers.

DIP minimum order
500boards
Standard lead time, working days
5-10days
Our assessment, working days
1-2days
DIP + packaging and test lines
2+1

01 SMT

SMT assembly

  • PCB surface mounting
  • Samples to volume
  • Consigned materials

Surface⁠-⁠mount assembly of PCBs, from samples and process confirmation through to volume production.

02 DIP

DIP assembly

  • Through⁠-⁠hole parts
  • Solder touch⁠-⁠up
  • Manual back⁠-⁠end work
  • Small to medium volumes

Two DIP lines for through⁠-⁠hole insertion, soldering, touch⁠-⁠up and back⁠-⁠end assembly, with packing and materials if needed.

03 Test

Test and repair

  • Functional tests
  • Fault diagnosis
  • Repair
  • Pre⁠-⁠shipment checks

Functional testing, fault diagnosis and repair to your specification, for more predictable quality before shipping.

04 Assembly

Final assembly

  • Module integration
  • Enclosure assembly
  • Semi⁠-⁠finished to finished

Product assembly, module integration and back⁠-⁠end work, with fewer hand⁠-⁠offs between steps.

05 Packing

Packing and pre⁠-⁠shipment

  • Labelling
  • Packing
  • Sorting
  • Pre⁠-⁠shipment checks
  • Batch delivery

A packaging and test line for packing, labelling, sorting and pre⁠-⁠shipment checks.

06 OEM

Manufacturing, packing and materials

  • Contract manufacturing
  • Packing
  • Material sourcing

Flexible support for electronics manufacturing, packing, testing and materials, to suit your product.

Prepare these for a faster quote

It does not have to be perfect: the clearer the information, the faster we can judge the process, lead time, testing and packing.

  1. 01Drawings, BOM, specifications or product photos
  2. 02Estimated quantity and target date
  3. 03Which of SMT / DIP / TEST / ASSY you need
  4. 04Test method, fixtures or acceptance criteria
  5. 05Packing, labelling and pre⁠-⁠shipment needs
  6. 06Consigned, sourced or partly sourced materials

From requirements to shipping

Every step serves the same aims: quality, customer satisfaction, efficiency.

  1. 01

    Requirements

    We confirm specifications, process conditions, scope, quantity and delivery date, so the project starts from a clear brief.

  2. 02

    Process review

    From the PCB, parts, fixtures, test conditions and packing, we work out how to run SMT, DIP, test and assembly.

  3. 03

    Production

    Surface mounting, through⁠-⁠hole insertion, soldering and assembly follow the agreed flow, with the process control it needs.

  4. 04

    Test and repair

    Functional testing, fault diagnosis and repair, so problems are solved before shipping.

  5. 05

    Assembly, packing, shipping

    Final assembly, packing, labelling and pre⁠-⁠shipment preparation, ready for your onward delivery.

Questions

What customers ask most, answered directly.

Not answered here?

Call +886 2 8209 4688
What is the minimum order?

It depends on the product. DIP assembly usually starts at 500 boards; SMT is quoted by board area. Send us your requirements and we will assess them.

Can you do part of the process?

Yes. We take SMT, DIP, testing or packing on its own, or the whole process end to end.

What is the lead time?

Standard orders take about 5-10 working days; rush orders can be arranged. The quote confirms the actual lead time, based on quantity and complexity.

Can you source materials?

Yes. We offer manufacturing, packing and material sourcing, and we also work with materials you supply.

How do we start?

Send your product details, quantity and requirements through the contact page. We reply with our assessment within 1-2 working days.

Attach drawings or a BOM: our assessment in 1⁠-⁠2 working days

You can send incomplete information; with an estimated quantity and a target date we can assess faster.